Core error prevention
Forced power test then unlock.
The safe and stable operation of the power system distribution network is directly related to the power supply quality of the power system, and has a direct impact on the national life and work. Therefore, to ensure the safe and stable operation ofdistribution network is of great significance to the healthy and stable development of China's economy and society.
The system takes the pre-control of operation safety risk as the core concept, compulsorily standardizes the on-site operation process, controls the unsafe behavior of people, the unsafe state of equipment and the unsafe factors of environment, and realizes the safety control of the whole operation process.
Forced power test then unlock.
Online mis-operation judgment.
Wireless real time data sharing.
High security intelligent lock control management.