Please submit your message online, we will contact you as soon as possible!
It can monitor and check the status of secondary equipment, grounding wire, tools and instruments, unlocking key, etc. in the error prevention workstation of the centralized control station.
Topology error proofing (inter station) and logic formula error proofing (logic formula is imported from station end) are used to check the remote control / sequence control operation initiated by centralized control station.
The topology error proofing technology is used to realize the inter station tie line error proofing and locking function.
Under the cooperation of master station and substation, the unique operation right control of equipment is realized among multi task, multi team and multi operation location.
When the centralized control master station simulates the operation, the system will judge the status of the relevant primary and secondary equipment, so as to realize the full error prevention.
Interact with PMS system to realize the synchronization of billing and simulation verification and the extraction of work ticket information, break through the information barrier and improve work efficiency.
The operation and maintenance team can prepare order in advance, and can view the substation equipment information remotely. According to the dispatching order sent by PMS, the operation order can be generated.