C-TOS (Container Terminal Optimized Solution)
Brief Introduction
C-TOS (Container Terminal Optimized Solution) of Nezha Technology is applicable to all scales of container terminals, ranging from 10-thousand-TEU terminals to 10-million-TEU terminals. With years of industry experience and accumulation of cutting-edge technology, Nezha Technology has transformed the manual process of container terminal production and management to automatic process, and has carried out intelligent upgrading of decision-making. C-TOS has four levels of framework: production management and operation level, operation monitoring and optimizing level, external interaction and service level, and top-level design and decision-making level. It has the key functions of visualized berth, visualized vessel operation, scientific stacking, container freight station (CFS) and production forecasting. At the same time, in order to meet the actual production requirements of different customers, the system also provides optional intelligent modules such as automatic yard crane, automatic quay crane, intelligent gate, cost analysis and automatic stowage, which can adapt to the local production environment and provide strong power to the container terminal operation.
Key Features
Applicable to Multiple Operation Areas
Applicable to multiple operation areas of the container terminal, realizing the overall management of different areas
Compatible with Various Container Terminals
Flexibly adapting to various container terminals and diversified service scenarios; Boosting the digital transformation of terminals
Decision Analysis Based on Multi-dimensional Data
Multi-dimensional data interaction; Summarizing work shift information; Monitoring the operation efficiency of quay cranes, yards, and external trucks in real-time
Visualized Management
Providing side view, plain view, aerial view and other multi-angle pictures of vessels and yards; Clear and intuitive, simplifying management
Advanced Concept of Terminal Management
Taking planning as primary, control as auxiliary; Reasonably allocating human resources; Promoting standardization of business operation
Comprehensive Intellectualization of Production Management
Automatic and intelligent process of production planning and organizing, operation process control, container handling equipment operation, event monitoring and feedback, and decision optimization
Architecture
Service Object
Maritime container terminals

River trunk and branch line medium and large container terminals

+86 021-55088033